
MIPC Main entrance MIPC site control office Main access road. MIP main access road has been open and paved in Phase 1A Electricity. 1 Substation (66/11kv)is set up with source from national grid. Water pipe and pump system from Ayeyarwaddy to MIPC. Ayeyearwaddy river is the longterm water source to MIPC development, has built 17.8km […]
Lotus Hong Kong Veneer Plywood factory Longyear China Shoes factory Dingwan China Biscuit factory Mandalay Furui candy and cake factory PECP Thailand-Myanmar JV cement pre-casting product factory Japfa Indonesia animal feed mill De Heus Netherland animal feed mill
Mandalay Baoshan Myotha Industrial Development China standard factory construction and leasing for 313 acre area Japha Indonesia Breeder & Broiler Farm Gold AYA China car assembly factory