MIPC completed key facilities and infrastructure

  • MIPC Main entrance
  • MIPC site control office
  • Main access road. MIP main access road has been open and paved in Phase 1A
  • Electricity. 1 Substation (66/11kv)is set up with source from national grid.
  • Water pipe and pump system from Ayeyarwaddy to MIPC. Ayeyearwaddy river is the longterm water source to MIPC development, has built 17.8km water pipe connect to MIPC, constructed by China Petroleum Pipeline Engineering.

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.