A vital transport corridor enhancing logistics and connectivity between MIPC, Semeikhon Port, and major transit hubs

Get In Touch

Connecting MIPC to Key Transit Hubs

To enhance the logistic and connectivity of MIPC and SMP, the Port Link Road (PLR) is planned at the beginning stage of MIPC and SMP development. The PLR will serve with 2 directions, 6 lanes and shop houses besides the road. PLR includes 2 sections:

  • River Port Link Road - Corridor between MIPC to River Port 17.8 km long, 200 feet wide.
  • Airport Link Road - To provide a direct connection between MIP to Yangon-Mandalay highway and it's international airport. Preliminary survey is completed for routes for the extension.