MIPC completed key facilities and infrastructure
MIPC Main entrance MIPC site control office Main access road. MIP main access road has been open and paved in Phase 1A Electricity. 1 Substation (66/11kv)is set up with source from national grid. Water pipe and pump system from Ayeyarwaddy to MIPC. Ayeyearwaddy river is the longterm water source to MIPC development, has built 17.8km […]